Coal & Mineral Processing Laboratory (CMPL)

nbk01

The Coal & Mineral Processing Laboratory (CPML) at UBC was originally built in 1984.

That building was renovated and upgrade in 2011 at a cost of $5,500,000. Designed by Johnson Davidson Architecture, the exterior of the 6,500 sqft building now boasts shimmering zinc-shingled tiles that represent one of the primary minerals mined by Teck Resources, the project’s leading donor.

Find us at:

Coal & Mineral Processing Laboratory
2332 West Mall
Vancouver, BC
V6T 1Z4

Getting here – UBC Maps
Get Google Directions